Technician Information for Andrew Lopez

First NameAndrew
Last NameLopez
Technician ID06269

Associated Labs

Lab NameLab Lab Manager NameFull AddressLab Lab DistrictPage Alias
No results found.

Test Methods

California Test (CT) Certifications

Total 8 items.
Test MethodObtained DateExpiration DateStatusIA ResponsibleWithin Lab(s) ScopeComments
CT 557 Temperature - PCC (JTCP - PCC)2025-04-242030-04-24ActiveSarmad Dalal(No lab)Actual obtained date is 07/12/2023. Provisional cert up to 10/31/2023. Expected to be enrolled in ACI session in October 2023.
CT 556 Slump - PCC (JTCP - PCC)2025-04-242030-04-24ActiveSarmad Dalal(No lab)Actual obtained date is 07/12/2023. Provisional cert up to 10/31/2023. Expected to be enrolled in ACI session in October 2023.
CT 543 Air Content of PCC - Volumetric Method (JTCP - PCC)2025-04-242030-04-24ActiveSarmad Dalal(No lab)(No comments)
CT 540 Making Cylinders - PCC (JTCP - PCC)2025-04-242030-04-24ActiveSarmad Dalal(No lab)Actual obtained date is 07/12/2023. Provisional cert up to 10/31/2023. Expected to be enrolled in ACI session in October 2023.
CT 539 Sampling Fresh Concrete (JTCP - PCC)2025-04-242030-04-24ActiveSarmad Dalal(No lab)Actual obtained date is 07/12/2023. Provisional cert up to 10/31/2023. Expected to be enrolled in ACI session in October 2023.
CT 523.1 Section B.1 & B.2 Flexural Strength (Field Fabrication) (JTCP - PCC)2025-04-242030-04-24ActiveSarmad Dalal(No lab)(No comments)
CT 518 Unit Weight - PCC (JTCP - PCC)2025-04-242030-04-24ActiveSarmad Dalal(No lab)(No comments)
CT 504 Air Content of PCC - Pressure Method (JTCP - PCC)2025-04-242030-04-24ActiveSarmad Dalal(No lab)Actual obtained date is 07/12/2023. Provisional cert up to 10/31/2023. Expected to be enrolled in ACI session in October 2023.

AASHTO/ASTM Proficiencies